Montecito Drive Transit Access Improvements Project 

Project Description:

The work compromises, but is not limited to; mobilization; traffic control; the removal and reconstruction of deteriorated pavement up to 7"; grind and overlay asphalt pavement up to 2"; striping; adjustment of utility manholes and covers; adjustment of utility valve cans, covers, and hydrant blowoffs; construction of PCC access ramps; storm drain improvements; street light conduits; driveway approaches; sidewalks; fence removal and replacement; retaining curbs and slough walls along Montecito Drive between Los Serranos Boulevard and Lugo Avenue.

*Mandatory Pre-Bid Meeting: Prospective bidders are required to attend a pre-bid meeting, which will be held on Tuesday, April 29, 2025, at 9:00 a.m. at the intersection of Montecito Drive and Lugo Avenue, in Chino Hills, CA 91709.

Location:

Montecito Drive between Los Serranos Boulevard and Lugo Avenue.

Current Construction Activities:

City Council approved project plans and specifications on Tuesday, March 25, 2025.   Anticipated construction time frame to begin early 2026.

Location Map
Notice of Exemption, Filed 3/26/25

Construction Timeframe: 

50 working days

Point of Contact:

Victor Yanez, Senior Engineer
Phone: (909) 364-2755
Email: vyanez@chinohills.org