Canyon Hills Road and Ginseng Lane Pavement Rehabilitation Project

Project Description:

The work comprises, but is not limited to:  Mobilization; Traffic Control; selective 2-inch grind and 2-inch AC overlay; 1.5-inch full-width grind and overlay; crack seal; application of Type 2 conventional slurry; and restoration of striping, pavement markings, and legends.

Depending on the existing condition and needs of a street, the repair work may consist of the following: 

  1. Removal by grinding small pavement sections and overlaying deteriorated asphalt pavement (patch work);
  2. Removal by grinding full-width sections and overlaying asphalt pavement;
  3. Crack sealing; and
  4. Slurry sealing over the entire pavement.

Slurry sealing is a preventative maintenance process that is designed to prolong the life of the asphalt surface and avoid the development of potholes.  

Location:

The following streets and limits are included in this project:

  1. Canyon Hills Road – From Carbon Canyon Road to Spring Creek Way; and 
  2. Ginseng Lane – From Carbon Canyon Road to End (approximately 350 feet east of Carbon Canyon Road).

Current Construction Activities:

  • The construction contract was awarded to All American Asphalt on July 14, 2020;  
  • Construction is scheduled to start on September 14, 2020, and is anticipated to be completed in early October 2020; and
  • Construction Message arrow boards will be posted at strategic locations of the project sites at least one week in advance before start of construction work; 

Please note the following advice during construction:

  1. “No Parking” signs will be posted on particular streets at least 48 hours in advance prior to the scheduled work;
  2. Work hours will be limited to 7:00 AM to 3:30 PM (unless the Contractor still needs to allow the pavement or slurry seal to dry completely prior to opening to vehicular traffic); 
  3. “Door Hangers” will be distributed at least 48 hours in advance at those areas/streets receiving slurry seal treatment; 
  4. Residents are advised to park their vehicles outside the repair work limits if they plan to travel during the construction work; and
  5. Access to businesses will be minimally interrupted but will not be closed.

Construction Timeframe:

25 working days

Project Contact:

Fe Rama, Senior Engineer
Phone: 909-364-2776
frama@chinohills.org