Los Serranos Infrastructure Impr. Phase 2B
Project Description:
Construction of 825 L.F. of 36-inch storm drain including manholes, catch basins, and connector pipes.

Location:
Montecito Drive from El Molino Avenue to Los Serranos Blvd. and Los Serranos Blvd. from Montecito Drive to 350' east of Montecito Drive.

Current Construction Activities:
 
Work was substantially completed on August 14, 2015. 

Construction Timeframe:  40 working days.

Project Contact:
Paul Montoya, Assistant Engineer